ZMS Cable logo Get a Quote
General multi-core control cable construction

How to Specify Control Cable for PLC and DCS Systems

Control cable for a PLC or DCS cabinet is often bought from a catalogue by core count and cross-section. That is enough to make the cable fit, but not enough to make the circuit reliable. The specification should also describe the signal, the interference environment, the route and the termination method.

Start with the signal, not the core count

Digital I/O, analogue 4–20 mA loops and drive feedback have different noise profiles. A 24 V digital signal can tolerate more interference than a low-level analogue measurement, but it can still misread if a nearby contactor generates a fast transient. For analogue loops, describe the signal level, the source impedance and whether the circuit is single-ended or differential.

If the circuit is in a hazardous area, say so at the start. An intrinsically safe loop may require a blue sheath, foil screen and a defined earth path. Those requirements change the construction and the documentation.

Then decide whether the cable needs a screen

Screening is not automatic. Use a screen when the circuit runs near variable-speed drives, servo amplifiers, switching power supplies or high-current conductors. Copper braid is robust and gives good high-frequency performance. Aluminium/polyester foil with a drain wire is lighter and cost-effective for static screening. For the noisiest applications, an individual screen plus an overall screen may be appropriate.

Describe the route and the environment

A cable in a panel duct, a cable in a tray and a cable buried between buildings are three different products. Direct burial and outdoor routes usually justify steel wire or steel tape armour. Confined public spaces may require LSZH compounds. Oil, coolant and repeated flexing point to PUR or a high-flex construction.

Purchase order checklist: core count, conductor class and cross-section, rated voltage, insulation, screen type and coverage, armour, sheath, standard, core identification, length and drum marking.

Confirm the details that are easy to miss

Ask for the construction drawing and the order-specific datasheet. Check the conductor class, because Class 1, Class 2 and Class 5 conductors behave differently in terminals and in flexible routes. Check the screen coverage and the drain wire. Check the sheath compound and the temperature rating. Finally, confirm the length and drum marking, especially for projects where cable is pulled in stages.

If you send those details to our team, we will review the construction and confirm what is standard, what is optional and what needs to be custom-made.

PLC and DCS signals usually end up on the instrumentation signal cable for analogue duty, the copper braided shielded cable where the route runs beside a drive, and the intrinsically safe control cable where the circuit enters a hazardous area.